Mixing station construction load calculation

Temporary power shall prepare construction design temporary power to determine the power line, the total distribution box, distribution box location and orientation of the line for load calculation, select transformer capacity and wire cross-section, the development of safe use of electricity Technical measures and electrical fire prevention measures.Precast concrete plant departments of audit and technical director for approval and implementation. distribution room (chamber), transformers and other electrical equipment located fixed barriers or safety mesh fence, height of not less than 2.5m, concrete mix plant clear prohibition, warning signs, signs of the production and installation should follow the "Railway safe and civilized construction project site sign "- Iron ban 5, Tiejing 1 and 16 requirements.