 Layout should be compact, try to land conservation. Stabilized Soil Mixing Plant reserve capacity is less than 10 days or else concrete requirements.Layout, mixing station to determine the size, land area, machinery and equipment configuration, function zoning, site foundation treatment, surface hardening, road planning, electrical design, drainage design, mixing and storage silo base station master basic design, color steel roof covering gravel silo design, office and living area design, material procurement metering system design, information systems design, organizational design, site laboratory construction, aggregate sieve wash system design, environmental systems (including sedimentation tank) design . Including cement, ready mix concrete plant foundation treatment such as mechanical inspection must be considered, the number of tube silo meet inspection requirements.