2013年8月2日星期五

Mixing station cleaning and storage of raw materials to be considered

Three electric power, water and access to convenient, smooth communication, to meet the mixing station network management requirements. Four venues open flat area to meet the construction needs. Concrete mixing plants to consider cleaning and storage of raw materials, concrete mix, mixer layout, logistics channel, office and living areas, etc., site area should be sufficiently large and flat, open, to meet the production needs of the construction. 5 to ensure safe from floods and landslides threaten to avoid landslides, rockfall, landslides, unstable rock and other locations. Avoid soil, batch mixing plant. Avoid high voltage lines and tall trees. And communication lines to maintain a certain distance. As far as possible away from the buildings built in the 20m, 300m away from centralized blasting area, 1 km away from the forest zone over the region. From the boiler room, generator room, kitchen and other temporary housing must be located no less than 10 m. Store flammable items should be specified in relation to the temporary storehouse safe distance away. 6 Construction interference, environmentally friendly and pollution treatment.

没有评论:

发表评论